● Method

How ReadMyBlueprint's Three-Pass Count Works

By The ReadMyBlueprint Team · Nov 10, 2026 · Method

Every plan set uploaded to ReadMyBlueprint is counted in three independent automated passes before its counts appear in your account. The second and third passes never see the first pass's numbers or each other's, and the three totals must agree within 3%. If they do not, a fourth pass traces the walls that differ. This checks that a count is consistent; it is not an accuracy percentage, and we do not publish one.

The passes

You upload the plan set yourself in the app. Until the checked counts are published your account shows "Your counts are being prepared," so the figures you see are the ones that went through these passes.

What every pass has to do the same way

The agreement rule

We compute the spread of the three totals as the highest minus the lowest, divided by the average. It has to be 3% or less on the total, and also on every wall type or sheet that makes up more than 10% of the scope.

Where passes usually disagree

These are the causes we check first when two passes differ:

Much of the work in a takeoff is on sheets other than the floor plan. Ceiling plans show bulkheads and soffits, sections show low walls and headers, and elevations show parapets. Each pass walks those sheet types as well, because a count that stops at the floor plan can agree with itself three times and still be short.

What you see in the result: every line names the sheet it came from, and anything the drawings do not settle is listed as assumed, with the one question that would settle it. See how we count and confidence labels.

What three passes do not prove

Check a count against its sheet

Upload a plan set in the app and check each line against the sheet it came from. Your first plan set is free, no card needed.

Take the tour Drywall takeoff

Frequently asked questions

What is a three-pass count?

Every plan set uploaded to ReadMyBlueprint is counted in three independent automated passes before its counts are shown in your account. The second and third passes are made without seeing the first pass's numbers or each other's, and the three totals must agree within 3%.

What happens if the three passes disagree?

A fourth pass runs on the disputed sheets and wall types only, using vector linework measurement, and we trace the specific walls that differ instead of averaging the totals. If a dispute remains, only the walls the passes agree on are delivered, and the disputed walls are listed as assumed with the range.

Is a three-pass count an accuracy guarantee?

No. Agreement between passes shows the count is consistent, not that it is right. All three passes read the same drawings, so an error in the drawings or a misread wall type can repeat in every pass. You still check the counts against the plans before you bid.

Why are lengths measured through door openings?

Every pass uses gross wall length, measured through door and opening gaps, so all three are on the same basis. Net-of-door figures are given as secondary numbers. A pass that nets the doors is redone rather than averaged in.

Is ReadMyBlueprint a service where someone does my takeoff?

No. It is self-serve software: you upload your plan set in the app. The three-pass check is how we confirm the counts before they appear in your account, not a replacement for your own review.

Related: How we count · Accuracy · Changelog